Phases - HVAC (Heating and Air Conditioning)
After bidding to several contractors we were very happy to be working with JRE Heating and Air. Their bid was better than just competitive and we really enjoyed working with Brian. He was creative and flexible about figuring out how to get ducts everywhere in a house that has so many volume ceilings.
Day 1) November 7th: Upstairs unit installed, ducts and registers installed, all that is remaining on the upstairs is to install the intake register and the thermostat and hook up to utilities to be provided later.
Following, some highlight pictures | Next Phase: Electrical

The guys from JRE Heating and Air begin installing the upstairs furnace. Click here for general HAVC details |

By the end of the day there was a furnace and ducts to each upstairs room. This system will provide upstairs, kitchen and family room HVAC and a seperate system will provide the rest of the downstairs.
|

In the master bedroom. |

Looking into the HVAC attic from the master bedroom, the furnace below and ducts above. |

This duct goes between the boys' loft, will feed air into both lofts and beyond into Devin's room |

In Dexter's room. The duct comes into the room in the wall and then goes around the corner goes into the loft. |

Reid's Room |

Looking from the landing toward the master bed and the soffit over the library |

Looking from the landing toward the master bed and the soffit over the library |

Looking from the landing toward the HVAC closet over the master bath. |

Looking up toward the master bed and the soffit over the library |
|
|
|
|